SELINSGROVE – Work will be done today on the Green Bridge near Selinsgrove. PennDOT says the contractor will be removing a temporary barrier from the bridge today and work will take place until 6 p.m.
All travel lanes will be open but flaggers will be on hand to slow traffic down if needed. Motorists should be alert and drive with caution through the work zone. (Ali Stevens)

